Let x be the number of hours ,8 boys take to do the work
So , 10 : 8 :: 12 : x
Product of means = Product of extremes
10x = 12 * 8
10x = 96
x = 96 / 10
x = 9.6
Answer : 8 boys will take 9.6 hours to dig the pitch.
Hope u understood the concept,
Thumps up plz........
-1
Sayantani answered this
10 boys dig pitch in = 12h
1 " " " " = 12 X 10
8 " " " " = 12 X 10/8
=120/8
=15 Hours.
3
Yash Jha answered this
time taken for 10 boys to do it = 12 hrs.
10 boys take 12hrs. so 1 boy will take more time
1 boy = 10 x 12 = 120
So, 8 boys will take = 120/8 = 15 hrs
0
Aryan Wadkar answered this
guys why is propotion so confusing ?
0
David John answered this
I REVIEWED ALL THE ANSWERS. IF TEN BOYS TAKE 12 HRS. HOW CAN 8 BOYS TAKE 15 HRS. DID YOU MENTION THAT THESE BOYS WERE LAZY. IF THEY WERE, THE ANSWER IS CORRECT.
1
Sonalcasey answered this
@david p john
there is a solution for every problem
hehhe
1
007 Abhi answered this
10boy=12hrs
8boys=(12/10)*8=9.6hrs
1
Sonalcasey answered this
if 10 boyz take 12 hrs
then 1 boy would take 1.2 hrs
so 1.2 multiplied by 8 = 9.6
result = therfore 8 boys would take 9.6 hrs
hope so it would help :D
1
Shrey answered this
time take for 10 boys to do it =12hrs 10 boys taken 12hrs ,SO 1 BOY WILL TAKE MORE TIME 1 BOY = 10 MULTIPLIED BY 12 =120 SO 8 BOYS WILL TAKE=12/8=15HRS